Wisk Aero opened a 100-by-100-foot vertiport at Hollister Municipal Airport in California on 29 October 2026. The company announced the facility the following day. The pad stays next to Wisk’s existing flight-test buildings and is equipped with proprietary transceivers fixed to the surface. Those transceivers are intended to support high-precision navigation tests in reduced and zero-visibility conditions, including when satellite navigation is unavailable.
The site is built to current FAA vertiport design standards using elevated steel structures, solar panels, power banks and taxiway connectors. It is designed to accept both conventional helicopters used as surrogates and Wisk’s Generation 6 autonomous aircraft. Planned work includes terminal-area manoeuvres, nominal landings, missed approaches and precision touch-downs in GPS-denied environments. The data are expected to feed the FAA’s eVTOL Integration Pilot Program and Wisk’s own certification work.
City filings indicate that initial traffic will be a piloted Bell 206 helicopter fitted with sensors, conducting basic take-offs and landings through early 2027. Generation 6 aircraft are scheduled later for autonomous hover and more advanced manoeuvres.
Airports and regulators will need to see documented landing and missed-approach performance under satellite-denied conditions, measured repeatability of touch-down position, and a clear list of infrastructure that must be present at each vertiport. Until those elements are shown and accepted, the Hollister pad remains a test site rather than a template for passenger service.