The FAA has released draft design standards for the places where helicopters and future electric air taxis would land, recharge and depart, setting out how vertical-flight facilities could fit onto rooftops and into existing airports. Public comments are open until January 11, 2027, with final guidance expected next summer.
The proposal, issued on October 22, brings existing heliport guidance and interim vertiport guidance into one document. It addresses the landing surface, surrounding safety space, approach paths, lighting, charging equipment and the powerful airflow generated by hovering aircraft.
In fact, the painted landing symbol is only the centre of the project. The aircraft needs a suitable touchdown-and-liftoff area, a final-approach-and-takeoff area and space around them intended to reduce the consequences of an aircraft straying from its expected position. It also needs a usable route through the air to reach the building and leave again.
The FAA says its proposed landing-area dimensions draw on research into where aircraft actually touch down relative to their intended aiming points. The design must accommodate that variation rather than assume every landing finishes precisely on the mark.
Approach geometry extends the project beyond the property boundary. For powered-lift aircraft, the draft specifies a maximum approach-surface slope of 15:1: 15 units of horizontal distance for each unit of height. The guidance is intended to accommodate differing aircraft performance and environmental conditions. It does not mean every proposed aircraft can use every site that meets the geometric standard.
Airflow creates another constraint. Downwash travels towards the ground; outwash spreads away from the aircraft. The FAA’s draft develops guidance on the hazards that this airflow can pose around vertical-flight facilities, making the space beside a landing area part of the design problem as well as the space beneath the aircraft.
On a rooftop, that work has to fit an elevated structure suitable for aircraft operations. At an airport, it has to fit among activities already taking place. The FAA’s stated objective is to integrate vertical-flight infrastructure without disrupting existing airport operations.
Electric aircraft add a second infrastructure network beneath the flight path. The proposal covers aircraft power and charging systems, alongside conventional fuelling. A landing site intended to turn aircraft around repeatedly must therefore be planned as both a flight facility and an energy facility. The draft’s publication does not establish that an individual site has secured the electrical capacity, equipment or approvals it will need.
Lighting and markings supply the pilot’s view of that infrastructure. The draft includes perimeter lights, glideslope indicators and other visual aids intended to make the landing area and approach understandable from the cockpit.
The passenger journey still has to reach the aircraft. A rooftop facility needs a workable connection between the street, the building and the boarding area, including for travellers who require assistance. The FAA announcement does not provide evidence that any particular proposed site has solved those access arrangements, and no site-specific accessibility assessment accompanies this update.
The agency has also separated the document’s provisions into standards, recommended practices, design considerations and requirements arising from existing laws and regulations. That structure is intended to make clear which provisions are FAA design standards, which are discretionary recommendations and which reflect obligations already in force.
This remains a draft, once finalised, Advisory Circular 150/5390-4 would replace the current heliport-design circular and the FAA’s December 2024 vertiport engineering brief. Individual facilities and aircraft operations would still need their applicable approvals.
The FAA will hold an online industry session on November 10, ahead of the January comment deadline. Airport owners, infrastructure developers, aircraft manufacturers and other interested parties can submit recommendations before the agency completes the guidance in summer 2027.